157 Parkshore Drive, Panama City Beach, FL 32413
Request More Information
  • All fields are required.
  • MLS#: 784346 ( Residential )
  • Street Address: 157 Parkshore Drive
  • Viewed: 93
  • Price: $4,750,000
  • Price sqft: $1,144
  • Waterfront: No
  • Year Built: 2026
  • Bldg sqft: 4151
  • Bedrooms: 6
  • Total Baths: 8
  • Full Baths: 7
  • 1/2 Baths: 1
  • Garage / Parking Spaces: 2
  • Days On Market: 105
  • Additional Information
  • Geolocation: 30.2661 / -85.9838
  • County: BAY
  • City: Panama City Beach
  • Zipcode: 32413
  • Subdivision: Carillon Beach
  • Elementary School: West Bay
  • Middle School: Surfside
  • High School: Bay
  • Provided by: Keller Williams Realty Emerald
  • DMCA Notice
  • Description
    Situated on one of the largest homesites in the gated community of Carillon Beach, this exceptional pre construction luxury custom home offers views of the Gulf and stunning views of Lake Powell, one of the world's rare and protected Coastal Dune Lakes. Designed by renowned architect J. Michael Hunnicutt and to be built by Grand Bay Construction, a respected builder known for quality craftsmanship, attention to detail, and experience in luxury coastal construction, the residence reflects timeless coastal architecture and elevated design throughout. The home features 4,151 square feet of heated and cooled living space and is thoughtfully designed with six ensuite bedrooms, including two primary suites, along with seven full bathrooms, one of which is located in the carriage house, and a half bath serving as the pool bath, in addition to an exterior shower, providing generous accommodations for family and guests. Interior living spaces are both spacious and versatile, featuring a well appointed living room with lake views and a separate den or game room ideal for entertaining or relaxation. The kitchen serves as the heart of the home and is designed with a large island with seating, Wolf appliances, a 48 inch subzero refrigerator and high end finishes with thoughtful details that balance functionality with refined coastal style. The residence includes an elevator shaft, a heated salt water swimming pool with an integrated jacuzzi, and a garage with dedicated spaces for a car and a golf cart, along with ample additional on site parking for up to six vehicles, making it ideal for both everyday living and hosting guests. Two covered porches and seamless indoor outdoor living spaces are anchored by a ventless fireplace in the living room and an outdoor fireplace overlooking the pool, creating inviting gathering areas designed for year round enjoyment. Located within a 24 hour private, gated community, Carillon Beach is celebrated for its pristine sugar white sand beaches, charming town center, boutique shopping and dining, and an exceptional array of amenities. Residents enjoy multiple beach access points, several community pools including a gulf front pool, tennis, pickleball, and basketball courts, and a golf cart friendly lifestyle enhanced by planned social events and activities hosted by the HOA, creating a vibrant yet relaxed coastal community. This property offers exceptional versatility as a primary residence, second home, or high performing short term rental with strong income potential. This property is pre construction. All renderings, plans, and images are conceptual, not exact, and subject to change. Finishes, dimensions, features, and specifications may vary, and the final product may differ from the renderings, plans, or models shown.
Payment Calculator
  •   Principal & Interest -
  •   Property Tax $
  •   Home Insurance $
  •   HOA Fees $
  •   Mortgage Insurance-

  •   Monthly -
For a Fast & FREE Mortgage Pre-ApprovalApply Now
Features
Building and Construction
  • Covered Spaces: 0.00
  • Exterior Features: CoveredPatio, Patio, OutdoorKitchen, OutdoorShower
  • Fencing: Partial
  • Living Area: 0.00
  • Roof: Metal
Land Information
  • Lot Features: SprinklerSystem, Paved
School Information
  • High School: Bay
  • Middle School: Surfside
  • School Elementary: West Bay
Garage and Parking
  • Garage Spaces: 1.50
  • Open Parking Spaces: 0.00
Eco-Communities
  • Pool Features: GasHeat, InGround, SaltWater, Community, Private
Utilities
  • Carport Spaces: 0.00
  • Cooling: CentralAir, CeilingFans, HeatPump, Zoned
  • Heating: Central, Electric, Fireplaces, HeatPump, Zoned
  • Utilities: CableConnected, ElectricityAvailable, NaturalGasAvailable, SewerAvailable
Amenities
  • Association Amenities: Gated
Finance and Tax Information
  • Home Owners Association Fee: 0.00
  • Insurance Expense: 0.00
  • Net Operating Income: 0.00
  • Other Expense: 0.00
  • Pet Deposit: 0.00
  • Security Deposit: 0.00
  • Tax Year: 2025
  • Trash Expense: 0.00
Other Features
  • Appliances: BarFridge, ConvectionOven, GasRange, IceMaker, TanklessWaterHeater
  • Interior Features: InteriorSteps
  • Legal Description: 5 3S 17W 6A2 BEG NW COR LOT 3 B-Q CARILLON BCH PH XXXVIII TH SWLY 110.52' NWLY 15.07' NWLY 29.30' SWLY 7.31' NELY 85.10' NELY 49.61' TO POB AKA LOT 2 BLK Q LESS PRCL TO 36459-394-928 ORB 4787 P 205 *******AND********* COM NW COR LOT 3 BLK Q CARILLON BEACH PH XXXVIII TH SW ALG R/W 49.62' FOR POB TH S 85.10' SW 45.81' NW 52.91' TO S R/W TH NE 20' NE 114.73' TO POB AKA LOT 1 BLK Q ORB 4787 P 208
  • Area Major: 03 - Bay County - Beach
  • Parcel Number: 36081-001-006
  • Style: Contemporary
  • The Range: 0.00
  • View: Gulf, Lake
  • Views: 93
Similar Properties

Active
Details for 20411 Front Beach Road, Panama City Beach, FL 32413
$5,400,000.00 ($988.29 / sqft )

20411 Front Beach Road More Like This

This thoughtfully designed RENTAL MACHINE checks all the boxes! 6589 sq, ft,of interior and covered exterior space to gather and entertain. As you drive up, ''Don't worry about where to park''. There

  1. Bedrooms: 8
  2. Baths: 9
  3. Approx. 5464 sqft
  1. MLSID: 783164
  2. Provided by 30A Local Real Estate
  3. Provided through
  4. DMCA Notice